The Bowling Green University Student Housing

 Bowling Green, Ohio

Synopsis:  Two separate 5 story student housing buildings on one site located in Bowling Green, OH

Our Scope:

  • Exterior and interior bearing walls
  • Installation of exterior sheathing
  • Coordination with architect, structural engineer of record, general contractor, joist supplier, interior framing contractor

Unique Challenges:

This project was fast-tracked from the beginning.  From design and coordination through erection.  Two separate crews worked onsite setting Shrock's panels in order to meet the project schedule.  Shrock sent up to 5 truckloads of panels per week. That's approximately 3,000 lf of wall fabricated and erected in one week.