Embassy Suites by Hilton Columbus Airport
Columbus, Ohio
Synopsis: A new 7 story hotel In Columbus OH
Our Scope:
6 stories of prefabricated load bearing walls
Exterior and interior bearing walls
Installation of exterior sheathing
Coordination with architect, structural engineer of record, general contractor, joist supplier, interior framing contractor
Unique Challenges:
A large hotel project which was erected during an Ohio winter. In order to meet the project schedule, it was necessary to prefabricate these walls offsite. The successful installation of wall panels led to a lasting and repetitive relationship between Shrock Prefab and the erecting contractor.