Synopsis: A five-story hotel located on a very tight project site on Smallman St. in Pittsburgh, PA
Our Scope:
- Five stories of prefabricated load-bearing exterior and interior wall panels
- CFS design for bearing wall framing with pre-installed sheathing
- Intensive delivery and logistics coordination between Shrock Engineering, Shrock Prefab, and the installing contractor
- Limited site access provided an installation challenge. A tight project schedule with a metal deck and concrete composite floor system created the need for a seamless and expedient wall erection. As soon as the concrete had sufficient compressive strength, wall panels were waiting onsite to be set